Products,Production Process

Fixed Mould Method
In order to get very high quality concrete products, it is essential that concreting, compacting and curing should be carried out at one place not moving during these process. This method is based on the said principle.
1. Concrete is placed evenly into the fixed mould from the moving wagon.
2. Filled concrete is carefully compacted by pendulous-type internal concrete vibrator.
3. The moulded concrete is stayed as it is and cured there in respect of getting accuracy of the product.
4. Curing is thought much for initial aging of the concrete products.
Vibrationg Mould Method
This method is applied to the product which is impossible by fixed mould method, for example, in case of very heavy and complicated reinforcements unable to use pendulous-type internal concrete vibrator. Further,users may request this method.
1. Concrete from the hopper is placed into the very strong mould which is fixed on table-type vibrator.
2. Compaction of concrete is carried out by both vibration of the table-type vibrator and pendulous-type internal concrete vibrator.
3. The moulded concrete is transferred to the curing area for curing.
Quallity Guarantee
Concrete segment is one of the highest previsional civil engineering elements and very severe strength, watertightness, durability etc are required. Tsuzuki`s quality management system is supporting high level of quality. In compliance with many requests from the users, research and development are continued all the time. Tsuzuki cooperates for any new projects with his accumulated and well experienced technologies.