2003
Tianjng Metoro Phase I, Steel Mould
Manufacturing of steel moulds for Tianjng Metro Phase I Project is now under
way smoothly for the project.
Guangzhou Metro Phase III
TSUZUKI/STEC has successfully secured the order for for the stee mounds for
Guangzhou Metro Phase III Project.

2002
Shanghai Metro MRT Yang Pu Line Project
The steel moulds were manufactured at STEC Machinery Plant under the
aforementioned Agreement.
Shanghai Metro MRT M8 Line DOT (Double-O-Tube) Project
1.One ring of DOT steel mould was exported form Japan.
2.Manufacturig of DOT steel moulds are in smooth progress as of
January,2003 at STEC Machinery Plant.

2001
Shenzen Metro Phase I
Among the aloue14 rings, 8 rings of steel moulds were re-used for the Project.
Shanghai Dailin Lu Road Tunnel Project
Technical Collaboratin Agreement was concluded between STEC and TSUZUKI, under which the steel moulds were manufactured at STEC Machinery Plant.

2000
Guangzhou Metro Phase II
Among the above 14 rings, 8 rings of steel moulds were re-used for the
phase II Project.

1995
Guangzhou Metro PhaseI
14 rings of steel moulds to produce concrete segments were exported form Japan.